Replacing your roof? Plan your solar panel removal first.
Get the solar work into the roofing schedule before crews arrive. We connect property owners with a licensed partner to assess panel removal, storage and reinstallation.
- Roof replacement, solar leaks, inspections, storm damage, and property access reviewed
- Residential, commercial, multifamily, HOA, warehouse, and portfolio projects evaluated case by case
- Equipment, agreements, permits, utility, operations, safety, storage, and timing factors considered before scheduling
Request Service
Tell us what happened and a service partner can review the scope.
Panel removal and reinstallation is a coordinated project, not a simple take-off and put-back. A qualified partner must review the array, inverter, racking, roof attachments, electrical disconnect, utility interconnection, equipment storage, warranties, financing or lease terms, permits, and the work being performed on the property. Large commercial work adds facility operations, roof phasing, site access, safety, inventory control, tenant or stakeholder communication, and utility closeout. Request Service for a scope review before a roof, move, sale, or capital project is scheduled.
Read the solar panels and roof replacement planning guideWho does what during a reroof with solar
| Party | Role in the project |
|---|---|
| Palm Beach Solar | Independent advisor: reviews your situation, matches a qualified licensed service partner, coordinates the comparison. Free, no obligation. |
| Licensed solar service partner | Inspects the system, quotes the scope, performs diagnosis/repair or removal/storage/reinstallation under its own license, contract, and warranty. |
| Roofing contractor | Performs roof work; coordinates sequencing and roof access with the solar partner. |
Large commercial removal & reinstallation: pre-mobilization control matrix
For a warehouse, multifamily community, retail center, industrial facility, institutional property, or multi-site portfolio, the project must be defined before the first panel is removed. This planning matrix is a scope checklist—not an engineering plan or a substitute for the contractor, roofer, authority having jurisdiction, utility, insurer, or owner’s requirements.
| Workstream | What must be confirmed before mobilization |
|---|---|
| Asset and agreement review | Site address and jurisdiction, array and inverter inventory, available as-builts, monitoring access, interconnection agreement, warranty records, financing or ownership documents, and any lease/PPA restrictions. |
| Roof and structural coordination | Roof condition and planned scope, work zones and phases, roof warranty requirements, structural or attachment review where required, flashing and waterproofing responsibility, roof access, and reroof handoff points. |
| Electrical and utility path | Serving utility, interconnection tier or agreement, service and meter configuration, visible disconnect requirements where applicable, shutdown/isolation procedure, permit status, inspection sequence, and return-to-service authorization. |
| Operations, safety, and access | Facility operating windows, tenant or stakeholder communication, roof and lift access, staging areas, fall protection and site-safety controls, emergency contacts, security, weather contingencies, and work-area isolation. |
| Equipment custody and storage | Serialized equipment inventory, labeling and photo documentation, chain of custody, transport, weather-protected storage, damage assessment, replacement decision rules, and disposition of components that cannot be reused. |
| Reinstallation and closeout | Approved roof-ready release, attachment and flashing sequence, electrical testing, monitoring verification, inspection documentation, utility paperwork, punch-list responsibility, and handoff of final records to the owner. |
- Large commercial scope, availability, and geographic coverage are reviewed case by case. Palm Beach Solar coordinates the comparison and introduces qualified licensed partners; each contractor is responsible for its own licensed scope, contract, schedule, warranty, and field work.
- Do not assume an existing system can be reinstalled without evaluation. Equipment condition, code, roof design, electrical configuration, warranty, utility terms, financing, and agreement restrictions can change the appropriate path.
FPL-serving commercial properties: interconnection checkpoints
Use this only for properties served by FPL. Other Florida utilities and municipal providers have their own current requirements. The property owner and qualified partner should confirm the live utility documents before final design or energization.
| Checkpoint | Current FPL guidance to verify |
|---|---|
| Tier and system sizing | FPL states that the system AC rating determines the agreement tier: Tier 1 up to 10 kW, Tier 2 above 10 kW through 100 kW, and Tier 3 above 100 kW through 2,000 kW. The system is estimated to produce less than 115% of annual kWh consumption, and renewable generation is limited to 90% of service capacity unless upgrades are addressed. |
| Pre-install approval | FPL states that all interconnection applications must be approved before installation and operation. The customer on the account completes the application and interconnection agreement and obtains the required building permit. |
| Tier 2 and Tier 3 scope | FPL identifies additional requirements for Tier 2 and Tier 3 systems, including proof of insurance, an application fee, and a visible load-break manual disconnect that is separate from and adjacent to the meter where required. |
| Utility-ready closeout | After construction, FPL requests evidence of approved local electrical and mechanical inspections. Operation other than testing and inspection is prohibited until the new bi-directional meter is installed. |
- Utility requirements and tariffs can change. This is a project-planning summary of FPL’s published guidelines, not a utility approval, engineering determination, or legal interpretation.
Official sources and verification
Review current utility, tax, and licensing requirements directly with the responsible agency before making a property or contract decision.
- Florida DBPR — Verify a licensed contractor (opens in a new tab)
- FPL — Net Metering program and current interconnection guidance (opens in a new tab)
- FPL commercial solar interconnection and net-metering guidelines — Tier 1 / Tier 2 / Tier 3, permits, inspections, and meter closeout (opens in a new tab)
- Florida Department of Revenue — Sales Tax Incentives for solar energy systems (opens in a new tab)
- Florida Statutes §193.624 — Renewable energy source devices (opens in a new tab)
Local service coverage
Existing-system service across South Florida
Requests are reviewed by property, equipment, and scope. Coverage includes residential and commercial inverter repairs, down or underproducing systems, solar leaks, roof coordination, panel removal and reinstallation, moving or transfer projects, and system expansion reviews through qualified service partners in the following primary counties and communities.
Palm Beach County
West Palm Beach, Boca Raton, Delray Beach, Boynton Beach, Palm Beach Gardens, Jupiter, Lake Worth, and Wellington
Explore local solar guidanceBroward County
Fort Lauderdale, Pompano Beach, Coral Springs, and Deerfield Beach
Explore local solar guidanceMartin County
Stuart and nearby Martin County communities
Explore local solar guidanceSt. Lucie County
Port St. Lucie and nearby St. Lucie County communities
Explore local solar guidanceIndian River County
Vero Beach and nearby Indian River County communities
Explore local solar guidanceStatewide Florida — large commercial
Large commercial removal and reinstallation projects may be reviewed statewide
Palm Beach Solar evaluates large commercial, multifamily, warehouse, institutional, and portfolio removal-and-reinstallation opportunities across Florida. The review starts with the roof scope, system and agreement records, serving utility, jurisdiction, operating constraints, access and staging, safety, storage, and return-to-service path. Coverage and acceptance are subject to project-specific partner availability, property conditions, licenses, utility rules, permits, engineering, and commercial scope review.
What Sets Us Apart
Roof Replacement & Repair
A reroof or roof repair may require temporary panel removal before roofing work begins. The roof contractor and solar partner should coordinate sequencing, flashing, attachments, access, inspection, and the conditions required for reinstallation.
Solar Leaks & Roof Access
If a leak is near or beneath the array, panels or racking may need to be moved to inspect the roof. The roof source, attachments, flashing, electrical pathways, and any replacement components should be documented before removal.
Storm Damage & Insurance Review
After a storm, photograph the roof and equipment when safe, notify the insurer when appropriate, and avoid moving damaged equipment yourself. A partner can organize the solar scope separately from coverage decisions made by the insurer.
Moving, Selling, or Transferring
A move or sale may involve transfer, payoff, ownership, lease, PPA, warranty, monitoring, and interconnection requirements. A partner can review the documents and identify whether removal, relocation, transfer, or reinstallation is appropriate.
Commercial Roof & Facility Projects
Businesses, warehouses, multifamily properties, and HOAs may need phased access, tenant or facility scheduling, roof coordination, equipment storage, insurance documentation, commercial permits, utility closeout, and production planning.
Statewide Florida Large Commercial
Large commercial, multifamily, warehouse, institutional, and portfolio removal-and-reinstallation requests may be evaluated statewide in Florida. Coverage, partner availability, jurisdiction, utility path, equipment condition, and scope must be confirmed before work is accepted.
Reinstall, Relocate, or Replace
After the roof or property work, the existing array may be reinstalled, redesigned, relocated, or partially replaced depending on equipment condition, roof layout, code, utility, warranty, and agreement requirements.
How It Works
Send Project Details
Share the property address, property type, reason for removal, roof or move timing, system age, available agreement or equipment information, and photos if available. Large commercial owners should also identify facility contacts, site count, roof phasing, and operating constraints.
Review Scope & Compatibility
A qualified licensed partner reviews the roof, equipment, mounting, electrical configuration, permits, warranties, utility requirements, access, operational controls, and project schedule.
Coordinate the Work
The project team aligns roof or facility work, shutdowns, equipment handling, inventory and storage, permits, inspections, stakeholder communication, and any required utility steps.
Reinstall or Recommend the Next Step
After the property work, the partner confirms whether the system can be reinstalled, relocated, expanded, redesigned, or replaced under a new scope, then completes the appropriate testing, monitoring, and closeout path.
Frequently Asked Questions
Potentially. Roof replacement often requires temporary removal, but equipment condition, mounting, roof layout, electrical disconnects, permits, utility requirements, warranties, and scheduling must be reviewed before the project is confirmed.
Related planning resources
- What to document when production concerns follow roof work or equipment movement
- Plan a commercial reroof with an existing solar array
- Treasure Coast panel removal and reinstallation
- Solar repairs and underproduction review
- Solar panel removal and reinstallation during a roof replacement
- Solar panels and roof replacement planning guide
- Residential solar savings estimate
Last updated:
Need help with an existing system?
Request a service review for repairs, roof work, inspections, or panel removal.