Get the code before anything else

Photograph the display or screenshot the monitoring alert. SolarEdge publishes meanings for each code family, and the prefix tells you which family you are in. Two codes that look similar can point at completely different repairs.

Codes also differ between the residential single-phase platform and commercial three-phase units, so the same underlying fault can appear under a different number depending on the model.

The four families

Grouped by what the code is telling you. Exact wording varies by model and firmware.

Code familyWhat it reportsWho handles it
Isolation and ground faults (for example 2x19, 2x25, 2x26)The array is not properly isolated from earth, or insulation to ground is insufficientStop. Licensed technician. SolarEdge documentation carries an electrical shock hazard warning for these
Surge events (for example 2x9, 2xD, 2xE)A ground current or AC voltage surge was detectedTechnician assessment, because a surge that reached the inverter may have damaged other equipment
Grid voltage and frequency trips (for example 2x1D, 2x1E, 2x1F, 2x20, 2x21, 2x29)Line-to-neutral or line-to-line voltage outside the configured window, high or lowUtility or grid-side investigation first, then the installer if the wiring is the cause
Grid down and internal faults (for example 2x28)No valid AC grid detected, so the inverter shut down per anti-islandingNobody if the utility is out. Technician if the grid is present and the code persists

The codes that mean stop

Isolation and ground fault codes mean the system has detected a path to earth that should not exist. That is a shock and fire risk, not a performance issue. SolarEdge's own documentation for the ground fault family carries an electrical shock hazard warning.

Do not reset repeatedly, do not open equipment, and do not re-energise to see whether it clears. A ground fault that clears on its own has not been fixed, and it will return.

The codes that are often the utility's problem

Overvoltage and undervoltage trips mean the inverter measured grid voltage outside the window it is configured to accept. That can be a genuine utility condition, a transformer or neutral problem, or an installation issue such as an asymmetric connection.

Before booking a technician, ask the utility whether there was a voltage event, and whether the transformer serving the address has had complaints. If the code repeats daily at the same time, that pattern is worth reporting to the utility with dates.

  • Note the times the code appears, because a repeating daily window suggests a grid pattern.
  • Ask neighbours on the same transformer whether they see flickering or dimming.
  • Report repeated voltage codes to the utility before authorising inverter replacement.
  • A code that persists with the utility confirming normal voltage points back at the wiring.

Warranty and what to ask

SolarEdge inverters typically carry a 12 year standard warranty with paid extension options, and labour is often separate from the equipment warranty. That distinction decides whether a replacement costs you a unit, a visit, or both.

When you request service, ask who files the manufacturer claim, whether the diagnosis fee is credited against the repair, and whether the replacement unit is new or refurbished. SetApp, SolarEdge's installer app, is how a technician configures and reads the unit, so a provider without it is not equipped for this brand.

  • Confirm the inverter's warranty start date and whether it was extended.
  • Ask whether labour is covered and by whom.
  • Ask whether the replacement is new or refurbished.
  • Confirm the firm uses SetApp, which is the SolarEdge commissioning and diagnostics tool.

Frequently asked questions

It means the array is not properly isolated from earth, which is a shock hazard. Do not reset it repeatedly and do not open equipment. It needs a licensed technician with the right insulation testing instruments.

Official sources and verification

Review current utility, tax, and licensing requirements directly with the responsible agency before making a property or contract decision.

Property-specific next step

Request Inverter Service

Send the code, the model number and the times it appears. We can review the request and check whether a licensed partner covers your inverter.

Palm Beach Solar plans and coordinates the project. The selected licensed installation or service partner evaluates, quotes, and performs work under its own contract, licensing, and warranty terms.